Friday, August 4

Next week's construction-related closures

I-10 – East San Antonio
  • Current until Saturday, August 12. 7:30 a.m. until 5 p.m. daily except Sundays. Westbound frontage road between Foster Road and FM 1516. Alternating lanes will close while crews install storm drain.
  • Wednesday-Thursday, August 9-10. 9 a.m. until 3 p.m. daily. Westbound exit ramp to FM 1516. The ramp will close while crews install storm drains. Traffic will exit Loop 1604, turn around and use the westbound frontage road to reach FM 1516.
  • Saturday, August 12. 7 a.m. until 7 p.m. Westbound entrance ramp from FM 1516. The ramp will close while crews install storm drain. Traffic will use the next available ramp.
I-35 – Austin area
  • Saturday-Monday, August 5-7. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, at FM 3406. All lanes will close while crews set bridge support beams overhead. Traffic will exit FM 3406, follow the frontage road and use the next available ramp to re-enter the highway.
I-35 – Northeast San Antonio
  • Current until Friday, August 11. 9 p.m. until 5 a.m. nightly. Southbound main lanes between Thousand Oaks and George Beach. Alternating lanes will close while crews work on the center median and lay asphalt.
  • Saturday, August 5 at 5 a.m. until Sunday, August 6 at 5 a.m. Southbound main lanes between George Beach and Thousand Oaks. Alternating lanes will close while crews work on new ramps.
  • Sunday-Monday, August 6-7. 9 p.m. until 5 a.m. Southbound main lanes at Randolph Boulevard. The left lane will close while crews repair the center median.
I-35 – East San Antonio
  • Tuesday-Wednesday, August 8-9. 9 p.m. until 5 a.m. Southbound main lanes at AT&T Parkway. All lanes will close while crews move barrier. Traffic will exit AT&T Parkway, continue along the frontage road and re-enter at the next available ramp.
  • Wednesday-Thursday, August 9-10. 9 p.m. until 5 a.m. Northbound main lanes at AT&T Parkway. All lanes will close while crews move barrier. Traffic will exit Frank Street, continue along the frontage road and re-enter at the next available ramp.
  • Friday, August 11 at 9 p.m. until Monday, August 14 at 5 a.m. Main lanes, both directions, at New Braunfels Avenue. All lanes will close while crews demo the old bridge deck. Traffic will exit New Braunfels Avenue, continue along the frontage road and re-enter at the next available ramp.
  • Wednesday-Thursday, August 16-17. 9 p.m. until 5 a.m. Northbound main lanes between Frank Street and Splashtown. All lanes will close while crews move barrier. Traffic will exit Walters, continue along the frontage road and use the next available ramp to return to the main lanes.
  • Thursday-Friday, August 17-18. 9 p.m. until 5 a.m. Southbound main lanes between Splashtown and Hines Street. All lanes will close while crews move barrier. Traffic will exit AT&T Parkway, continue along the frontage road and re-enter at the next available ramp.
I-35 – South San Antonio
  • Current until Thursday, August 31. 9 a.m. until 5 p.m. daily. Northbound frontage road at Indian Creek. The right lane will close while crews repair guardrail.
I-410 – South San Antonio
  • Monday-Thursday, August 7-10. 9 a.m. until 4 a.m. daily. Main lanes, both directions, at Somerset. Alternating lanes will close while crews do concrete work.
I-410 – Northwest San Antonio
  • Current until August 31. Northbound exit to Culebra Road. The exit will close while crews widen the main lanes and frontage road. Traffic will exit Ingram Road, turn around and get to Culebra on the southbound frontage road.
  • Current until August 31. 9 a.m. until 4 p.m. daily. Frontage roads, both directions, between US 90 and Hwy 151. Alternating lanes will close while crews do road work.
  • Current until September 1. 9 p.m. until 5 a.m. nightly, Sunday nights through Thursday nights as needed only. Northbound main lanes between Marbach Road and Military Drive. All lanes will close while crews do overhead bridge work. Traffic will exit Hwy 151, continue along the frontage road and enter the highway at the next available ramp. Officers will control traffic at intersections. This closure will not be employed simultaneously with the northbound frontage road closure.
  • Current until September 1. 9 p.m. until 5 a.m. nightly, Sunday nights through Thursday nights as needed only. Northbound frontage road between Marbach Road and Military Drive. All lanes will close while crews do overhead bridge work. Traffic will use eastbound Hwy 151 and Military Drive to reach its destination. Officers will control traffic at intersections as needed. This closure will not be employed simultaneously with the northbound main lanes closure.
  • Saturday, August 5 until Tuesday, September 5. 9 p.m. until 5 a.m. nightly. Northbound frontage road between Hwy 151 and Military Drive. The left lane will close while crews do bridge work.
  • Saturday, August 5 until Tuesday, September 5. 9 p.m. until 5 a.m. nightly. Northbound main lanes between Hwy 151 and Military Drive. The right lanes will close while crews do bridge work.
  • Saturday, August 5 until Friday, September 8. 9 p.m. until 5 a.m. nightly. Northbound main lanes between Culebra and Ingram roads. The left two lanes will close while crews build overhead highway sign supports.
  • Saturday-Sunday, August 5-6. 9 p.m. until 5 a.m. Northbound frontage road between Hwy 151 and Military Drive. All lanes will close while crews pour concrete. Traffic will use Hwy 151, Ingram Road and Military Drive to reach its destination.
  • Sunday-Monday, August 6-7. 9 p.m. until 5 a.m. Southbound frontage road at Hwy 151. Alternating lanes will close while crews restripe the intersection lanes.
  • Monday-Tuesday, August 7-8. 8 p.m. until 5 a.m. Southbound main lanes at US Hwy 90. The two right lanes will close while crews set barrier.
  • Monday-Tuesday, August 7-8. 9 p.m. until 5 a.m. Southbound main lanes between Military Drive and Hwy 151. The right lane will close while crews move barrier.
  • Wednesday-Thursday, August 9-10. 9 p.m. until 5 a.m. Southbound frontage road between Leon Creek and Hwy 151. The left lane will close while crews switch traffic onto the new Military bypass overpass and the new southbound exit to Hwy 151. This closure includes the ramp to Hwy 151. Traffic will exit Military Road and continue along the frontage road to reach its destination.
  • Wednesday-Thursday, August 9-10. 8 p.m. until 5 a.m. Southbound frontage road at US Hwy 90. The left lane will close while crews set barriers.
U.S. Hwy 90 – West San Antonio
  • Thursday-Friday, August 10-11. 9 p.m. until 6 a.m. Main lanes, both directions, between I-410 and West Military Drive. The two right lanes will close while crews set barrier.
U.S. Hwy 281 – North San Antonio
  • Monday-Tuesday, August 7-8. 9 p.m. until 5 a.m. Southbound main lanes between Marshall Road and Stone Oak Parkway. The right lanes will close while crews set barrier.
  • Tuesday-Thursday, August 8-10. 9 p.m. until 5 a.m. nightly. Southbound main lanes between Stone Oak Parkway and Evans Road. The right lanes will close while crews set barrier.
  • Thursday-Friday, August 10-11. 9 p.m. until 5 a.m. Southbound main lanes between Evans Road and Encino Rio. The right lanes will close while crews set barrier.
  • Monday-Tuesday, August 14-15. 9 p.m. until 5 a.m. Southbound main lanes between Encino Rio and Redland Road. The right lane will close while crews set barrier.
  • Tuesday-Wednesday, August 16-17. 9 p.m. until 5 a.m. Southbound main lanes between Redland Road and Agora Palms Drive. The right lane will close while crews set barrier.
  • Wednesday-Friday, August 16-18. 9 p.m. until 5 a.m. Southbound main lanes at Sonterra Boulevard. The left lane will close while crews set barrier.
U.S. Hwy 281 – Near North San Antonio
  • Tuesday-Wednesday, August 8-9. 9 p.m. until 6 a.m. Southbound exit ramp to Stadium Drive and Mulberry Road. The ramp swill close while crews do concrete work. Traffic will take the next available ramp and turnaround.
Hwy 151 – Northwest San Antonio
  • Current until August 31. Westbound exit ramp to Hunt Lane. The exit will close while crews work on retaining walls. Traffic will exit Ingram Road and follow the frontage road to reach its destination.
Other roads – Seguin
  • Current until August 31. Austin Street between Martindale and Seidman. The road will be converted to one-way only, moving southbound only, while crews do road work. Northbound traffic will use Guadalupe Street to reach its destination.
Other roads – New Braunfels
  • Current until Friday, August 18. 8:30 a.m. until 4 p.m. daily, Monday-Friday only. Hwy 46, both directions, between FM 758 and I-35. The right lane will close while crews replace curb and install traffic signals and guardrail.
Other roads – Northeast San Antonio
  • Friday, August 4 at 9 p.m. until Monday, August 7 at 5 a.m. Walzem Road, both directions, at I-35. All lanes will close while crews work on columns. Traffic will turn right onto the frontage road and turn around at the next cross street to reach its destination.
Other roads – East San Antonio
  • Friday, August 11. 10 a.m. until 8 p.m. New Braunfels Avenue, both directions, at I-35. All lanes will close while crews demo the old bridge deck. Traffic will be allowed to turn right onto the frontage roads and will use Walters Street to cross I-35.
  • Friday, August 11 at 9 p.m. until Monday, August 14 at 5 a.m. New Braunfels Avenue, both directions, at I-35. All lanes will close while crews demo the old bridge deck. Traffic will be allowed to turn right onto the frontage roads and will use Walters Street to cross I-35.
All closures are pending weather.